Parionice
With direct steaming
The body of the steam chamber is built or made of panels. Construction work is carried out by the investor according to drawing of the equipment manufacturer.Material is placed into the steam chamber by forklift or manually.In the front of the chamber sliding door is installed with a lift mechanism. The door is made of insulated panels with aluminum lining sheets. All equipment in the door is made of stainless materials.Steam is introduced through a perforated pipe placed in the rim of steam chamber in the floor.
With indirect steaming
The body of the steam chamber is built or made of panels. Construction work is carried out by the investor according to drawing of the equipment manufacturer.
Material is placed into the steam chamber by forklift or manually.In the front of the chamber sliding door is installed with a lift mechanism. The door is made of insulated panels with aluminium lining sheets. All equipment in the door is made of stainless materials.
Boiling water is pumped into the heat exchanger of stainless pipes placed in the channel